Site Preparation for SGI 2000-Series, Origin Family, Onyx2®, Octane®, and O2®

Document Number: 007-3452-004

Front Matter

| List of Figures | List of Tables |


Table of Contents

About This Guide
Guide Organization
The SGI Product Line
Additional Documentation
Reader Comments

1. Planning the Installation
Organizing Activities
Site Preparation Checklist
Site Preparation Checklist Details

2. Site Preparation Concepts
Physical Location
Electrical Requirements
Thermal Requirements
Environmental Requirements
Ergonomic Requirements
Local Regulations
Planning for the Future
Converting Between U.S. Customary Measure and Metric Measure

3. Site Preparation for O2 Systems
Selecting a Location for an O2 System
O2 Site Requirements

4. Site Preparation for Octane
Selecting a Location for an Octane System
Octane Site Requirements

5. Site Preparation for Origin200 and Origin Vault
Selecting a Location for an Origin200 or Origin Vault System
Wiring and Grounding Requirements for Origin200 and Origin Vault Systems
Origin200 Site Requirements
Origin Vault Site Requirements

6. Site Preparation for SGI 2000-Series and Onyx2 Base Modules and Deskside Systems
SGI 2000-Series Deskside and Onyx2 Deskside Shipping Crate
Selecting a Location for an SGI 2000-Series Deskside or Onyx2 Deskside System
SGI 2000-Series Base Module Site Requirements
Onyx2 Deskside System Site Requirements

7. Site Preparation for Onyx2 Graphics Insert Modules
Selecting a Location for an Onyx2 Graphics Insert Module
Onyx2 Graphics Insert Module Site Requirements

8. Site Preparation for SGI 2000-series, Origin Peripherals, and Onyx2 Rack Chassis
SGI 2000-Series, Origin Peripherals, and Onyx2 Rack System Shipping Crate
Selecting a Location for an SGI 2000-Series, Origin Peripherals, or Onyx2 Rack System
SGI 2000-Series, Origin Peripherals, and Onyx2 Rack Chassis Internal Wiring
SGI 2000-Series Rack Chassis Site Requirements
Origin Peripherals Rack Chassis Site Requirements
Onyx2 Rack Chassis Site Requirements

A. Site Preparation for External Peripherals
Monitors
Keyboards
Mice
External SCSI Devices
ASCII Terminals

B. Site Power and Power Cables
Installing Site Power Circuits
Power Cables and Connectors

C. Safety and Protection Equipment
Installing Cable-Management Equipment
Emergency Power-Off Switch
Fire-Fighting Equipment With an Electrical Rating
Lightning Protection
Power-Line Treatment

Index